Field Ops View

Site 2726, Reynoldsburg, OH, Nightly Operations

Built for the people actually running the shift, checking in, capturing photos, validating APs, logging cables, and keeping Phil and Wayne ahead of surprises.

Shift
9pm to 7am, Sun night to Thu night
Week-1 hard stop
Initial photos by Tue morning 2026-05-19
Daily update cadence
Mon to Fri mornings after shift
Night support
Phil check-in and out every shift
Required photo locations
10
Every location needs door closed, open, interior, and extra angles if needed
APs to verify
6
AP018, AP019, AP511, AP512, AP229, AP809
Saved draft emails
8
Templates ready for photo package, shortages, ports, and escalation
Primary week-1 failure modes
4
Photos, inventory lag, AP mismatch, closet naming mismatch

Nightly startup checklist

  • [ ] Sign in at GC trailer
  • [ ] Check in with REX
  • [ ] Check in with Phil Garvin
  • [ ] Confirm the night's target areas and blockers
  • [ ] Capture required photo sets if in startup window
  • [ ] Log every cable, device, switch, and port touched
  • [ ] Note missing material, port issues, construction conflicts, or damaged DMBs
  • [ ] Check out with REX
  • [ ] Check out with Phil, or ICE PM if late OT checkout applies
  • [ ] Prep the next morning's daily update before sleep

Week-1 must-win items

  • Photos: GDC, GM, GRC, PICS, TLE, UPC, RCV01, RCV02, RX, Rear EDC
  • AP validation: verify the 4 new and 2 moved APs physically match prints
  • Inventory: start within 24 hours of receipt, photograph sheets, prep shortage notes
  • Meetings: attend 2 morning meetings per week and keep Wayne aware of the days
  • Documentation: first daily updates must already look Wayne-compliant

Photo shot list

LocationRequired shotsStatus
GDCClosed, open, interior, extra anglesPending
GMClosed, open, interior, extra anglesPending
GRCClosed, open, interior, extra anglesPending
PICSClosed, open, interior, extra anglesPending
TLEClosed, open, interior, extra anglesPending
UPCClosed, open, interior, extra anglesPending
RCV01 / RCV02Closed, open, interior, extra anglesPending
RXClosed, open, interior, extra anglesPending
Rear EDCClosed, open, interior, extra anglesPending

Field escalation rules

  • Ports: route through Phil before last-minute turn-up creates OT.
  • DMB damage or install delay: notify RPL and Wayne immediately with photos.
  • OT after 6am: needs RPL/REX email to ICE PM, calls or texts alone do not count.
  • Absent or leaving early: notify REX and ICE PM before scheduled time, get the right email trail.
  • Conduit, backboard, switch-relocation delay: escalate to Wayne early, not when it is already blocking the shift.

AP and switch tracking focus

ItemWhat to check
AP018, AP019, AP511, AP512Correct new locations, mounting readiness, field match to AP map
AP229, AP809Correct moved locations, no stale assumptions from old placement
Ping sweep vs worksheetClosets / switches that appear in worksheet but not clearly in baseline must be reconciled early
Port worksheetEvery touched cable must end up with correct switch / port documentation